PROPOSED IMPROVEMENTS

21201-ED-DESIGN - sept-26-2022a (1).jpg

2

1

3

4

K3rd Grade Building
eddie - no wht.png

NEW! K-3RD GRADE BUILDING

  • Consolidation to Single Campus

  • Separate Parent + Bus Loops

  • Appropriately Sized Classrooms

  • Modern, Flexible Furniture

  • Dedicated Specialty Classrooms

  • Dedicated Gymnasium

  • Dedicated Cafeteria

  • Ability for Future Expansion

1

EPS New K-3 Building Updated 10 3 2022 - Main Entry.jpg
EPS New K-3 Elementary 09 13 2022.jpg

* Renderings and site plans are conceptual. Appropriate stakeholders would be engaged during the design phase. 

INTERMEDIATE BUILDING

  • Replace Boilers + Temperature Controls

Intermediat Building

2

EDWARDSBURG MIDDLE SCHOOL

  • Secure Vestibule + Office Renovation

  • Renovate Auditorium to New Classrooms

  • Roof Replacement

  • Replace Boilers, Mechanical Systems, and Temperature Controls including Air Conditioning

Middle School

3

EDWARDSBURG HIGH SCHOOL

  • Secure Vestibule + Office Renovation

  • Multipurpose Room Addition for Large Group Instruction, Athletics and Other Uses

  • Athletic Trainer / Health Suite Addition

  • Career Technical Education Space Upgrades

  • Fine Arts - Practice Room / Storage Addition

  • Roof Replacement

  • Replace Boilers, Mechanical Systems, and Temperature Controls including Air Conditioning

  • Dedicated Cafeteria Space

High School